Your present location:HomeApplication caseIndustrial Park > FOSS?6+1 solution for Xinxing Cast Tube Co

In May, 2016, ESSE signed the contract with Xinxing Cast Tube in Guangdong in BOT mode for its 90m2 sintering plant FGD facilities. ESSE will operate this facility for 10 years after signing the operation contract. The engineered efficiency of de-SO2, de-NOx, de-dust and De-Mercury of this system shall reach 99%, 80%, 99% and 96% respectively. Meanwhile, the sub-product production line is also equipped so as to reutilize the waste water, solid wastes such as slag etc to produce green and recycling construction material.

 

ESSE plans to set up a production base of its green and recycling construction material in Guangdong province with annual productivity of 1 million m3 in relying on the fuel gas treatment recourses of nearby steel works and power plants, such as Xinxing cast tube Co., Shaoguan I & S Co., etc. to produce magnesium sulfate and magnesium nitrate from the waste solution after fuel gas desulphurization. Then mix the sub-products with slag and fly ash to produce the crystal powder which is the raw material of the green construction material.

 

This production base is one of our references to demonstrate our recycling economic concept of how to reutilize the wastes from fuel gas treatment and other solid wastes in steel plants and power plants to become the recycling green construction material.

download attachments :

亚洲欧美在线x视频